Nationwide Coverage | Contact our team: 0345 141 0000

High performance construction repairs prevent leisure project delays

High performance construction repairs prevent leisure project delays

Plastic Surgeon, the expert fine finishing commercial building repair specialist, demonstrates on-site building repair services that prevent delays and will deliver on time and on budget leisure projects.

Plastic Surgeon –  the UK nationwide  cosmetic repair specialist and expert in material and building product repairs has proven experience in carrying out repairs for swimming pools, hotels, restaurants and museums.  With the 2012 Olympics just around the corner, Plastic Surgeon’s ‘repair not replace’ service is a cost-saving strategy that many of the contractors working on the Olympic sporting and leisure projects can benefit from.

Rob Mouser, Managing Director, Plastic Surgeon said: “Most construction projects will endure cracks, chips, stains and scratches to the surfaces that have been installed.  Replacing these components can take time, cause delays in the programme and will eventually increase the overall cost of a building project.”

He went on to say: “The sub contractors working on the Olympic projects must have their projects finished on time.  Plastic Surgeon can offer a complete, fast and effective service to repair general snagging issues such as those caused by on-site accidental damage.”

Plastic Surgeon specialises in repairing all types of building damage, both internally and externally, eliminating the costs and delays associated with replacement. Plastic Surgeon has carried out thousands of repairs to signage, sinks, tiles, worktops, seating, showers and cills, in materials ranging from stone and granite to wood and plastic.

The fine finishing expertise means that repairs are virtually invisible and undetectable, and with the company’s well earned reputation for speed and efficiency, disruption is minimal.


Get our latest blog posts direct to your inbox